Barge                                             £  30,000
360 Excavator                              £  25,000
Barrier system                             £  25,000
Barrier deployment craft           £  30,000
Processing vessel                         £  (1M)
Waste separation station            £  50,000
Pyrolysis plant                             £ 145,000
Granulating plant                        £  55,000
Biomass pelletizer                       £  40,000
Bailer                                             £  15,000
Sundry equipment                      £    2,000
HGV Bulker                                  £  30,000
8 storage bins                               £  16,000
Fork Lift                                        £    8,000
Clothing/safety equip                 £    5,000
Fire safety equip                          £    5,000
Insurance/admin                         £  19,000
Total budget                                 £  1.5M

I want my money to go to:

Each of the 10 rivers needs a barrier system to top the waste entering the ocean

It has been claimed that over 8,000,000 tons of waste enters our oceans every year

10 Major rivers have been identified as contributing 90% of this waste.

Ocean Resource Management can stem this flow at each river mouth.

Stem the flow of waste

Project 10

Ocean Resource Management 

Project 10